AUTOMOTIVE – TAMEL

AUTOMOTIVE The project included: End-to-end relocation, including.. Preparation of utility connections at the destination. A 20-month long project to relocate the production lines of the Austrian company ATB Spielberg GmbH to the ATB Tamel S.A. plant in Tarnów, Poland. More than 2,000 tons of machines and plant were relocated (including 4 loads 56 tons each) […]
Relocation of a 32-ton CNC machining centre

AEROSPACE Relocation of a 32-ton CNC machining centre The relocation work was completed in 8 hours with positioning, levelling, testing and preparation for acceptance and commissioning done in 7 days. The machine was moved around the shop floor using an air cushion system (heavy-duty floor protection) Contact us. Find out more. CONTACT
AUTOMOTIVE – SCHOLL GLASS

AUTOMOTIVE Client: Schollglas Group Implementation period: 2018/2019 The project included: Dismantling, transfer and re-installation of 8 production lines, comprising about 30 unit, plus a 30-ton main furnace Refurbishment, cleaning and renovation of equipment Pre-commissioning preparations of the lines. This was a relocation project implemented in-production, with the plant of origin successively shut down while the […]